Oregon Ducks Football New Indoor Facility Update 06/2025
When we last looked about a year ago, structural work on MLK Jr. Blvd and Leo Harris Pkwy was being done ahead of fall camp. The pictures are nondescript; however, I wanted to show the “before” look around Autzen and the practice fields, because it soon would not look as we had become accustomed to.
Well, the future is now.
The roadwork on Leo Harris is finished. We can see here where it has been made wider, as the above illustration shows.
Badwater
And then Leo Harris runs pretty much a straight shot along the south side of Autzen, instead of entering at a diagonal.
Badwater
Some concrete work is taking place at the entrances to the two future outdoor practice fields.
Badwater
Badwater
Looking from the west construction entrance, we get a wide view of the construction site.
Badwater
This is further to the left, where the groundwork for the indoor building is being built.
And more of a straight-on shot here.
Badwater
The work for columns is beginning to show:
Badwater
Badwater
And a closer look at what is going on with the flooring of the facility.
Badwater
This is what the site looked like on Thursday, 6/19. I will have further updates as significant work progresses, so that all of you can see what is going on.